Chapter 6: Project Management

No description yet. This curated deck is ready for daily study.

Total cards: 18•Content version: v4•Public deck•Updated: 8/1/2026

Card preview (18)

#1
Front (Question)

project management techniques which have been created out of the need of industrial and military establishments to plan, schedule and control complex projects

Back (Answer)

PERT-CPM

#2
Front (Question)

primarily to simplify the planning and scheduling the large and complex projects to handle uncertain activity times, initially for the Polaris missile nuclear submarine project

Back (Answer)

PERT/ Program Evaluation and Review Technique

#3
Front (Question)

statistical tool used in project management which was designed to analyze and represent the tasks involve in completing a given projects, especially the time needed to complete the task and minimum time needed to complete the total project

Back (Answer)

PERT/ Program Evaluation and Review Technique

#4
Front (Question)

It is for industrial projects for which activity times generally were known, the computation was design for a computer and was first applied to the construction of a new chemical plant

Back (Answer)

CPM/ Critical Path Method

#5
Front (Question)

developed by U.S. Navy in 1957

Back (Answer)

PERT/ Program Evaluation and Review Technique

#6
Front (Question)

developed by DuPont & Remington Rand in 1957

Back (Answer)

CPM/ Critical Path Method

#7
Front (Question)

have been used to plan, schedule, and control a wide variety of project

Back (Answer)

PERT-CPM

#8
Front (Question)

Managerial Functions

Back (Answer)

-Planning -Scheduling -Control

#9
Front (Question)

Function of PERT-CPM

Back (Answer)

a. Research and design of new products and processes b. Construction of buildings and highways c. Maintenance of large and complex equipment d. Design and installation of new systems

#10
Front (Question)

PERT-CPM can answer the ff:

Back (Answer)

a. Total time to complete project b. Scheduled start and finish dates for each specific activity c. Critical Activities d. Exact time/days/weeks that non-critical activities can be delayed

#11
Front (Question)

events that immediately precedes the next event without any intervention

Back (Answer)

predecessor event

#12
Front (Question)

an event that immediately follows a previous event without any intervention

Back (Answer)

successor event

#13
Front (Question)

Earliest Start/ ES

Back (Answer)

maximum Earliest Finish/ 0 for no predecessor

#14
Front (Question)

Earliest Finish

Back (Answer)

Earliest Start + Completion Time

#15
Front (Question)

Latest Finish

Back (Answer)

minimum Latest Start/ maximum Earliest Finish for not immediate predecessor

#16
Front (Question)

Latest Start

Back (Answer)

Latest Finish - Completion Time

#17
Front (Question)

path of the activities, from the Start node to the Finish node, with 0 slack times

Back (Answer)

Critical Path

#18
Front (Question)

Project Completion Time

Back (Answer)

equal the maximum Earliest Finish