#1
Front (Question)

What the purpose of a desk study?

Back (Answer)

Determine: Historical development of site Ground investigation strategy Environmental and engineering constraint to development

#2
Front (Question)

What is the purpose of the introduction?

Back (Answer)

Set out aims

#3
Front (Question)

Why are walkover surveys important?

Back (Answer)

Assess on site constraints Look for invasive species

#4
Front (Question)

Give two examples of invasive species

Back (Answer)

Japanese Knotweed and Giant Hogweed

#5
Front (Question)

Why are invasive species a big issue?

Back (Answer)

Can damage structure if left unchecked and costly to remove

#6
Front (Question)

What aspects should be covered in the geology section of the desk study?

Back (Answer)

Lithology, depths, hydrology/hydrogeology and mineworks

#7
Front (Question)

What two sources of information help assess geology of site?

Back (Answer)

BGS Map and borehole records

#8
Front (Question)

What four areas are covered in environmental assessment?

Back (Answer)

Preliminary environmental assessment Potential contaminants of concern e.g. metals, hydrocarbons, asbestos Creation of conceptual model Pollution linkages and risk assessment

#9
Front (Question)

What are the three key areas the conceptual model deals with? Give three examples of each

Back (Answer)

Sources - metals, solvents, pesticides Pathways - human (ingestion/inhalation), plants (soil, uptake of contaminants), controlled waters (groundwater, service trenches) Receptors - humans, plants, buildings

#10
Front (Question)

Give four examples of potential risks highlighted in risk assessment

Back (Answer)

Groundwater flow Leaching Direct contact Dermal contact

#11
Front (Question)

Give an example of an environmental constraint

Back (Answer)

Potential excavation of contamination hotspots

#12
Front (Question)

Why is made ground considered a geotechnical constraint?

Back (Answer)

Variable engineering properties Uncompacted, randomly placed Large obstructions

#13
Front (Question)

Why might natural soil be a geotechnical constraint?

Back (Answer)

Insufficient bearing capacity

#14
Front (Question)

How could mineral stability become an issue?

Back (Answer)

Possible presence of worked coal seams