#1
Front (Question)

Iterative Process

Back (Answer)

Iterative programming because it involves changing the prototypes based on client comment

#2
Front (Question)

Advantages of iterative programming

Back (Answer)

Client should not be surprised at final product as they are involved in development Easy to make changes early on Some prototypes can evolve to be part of the working system Eg SCRUM system

#3
Front (Question)

Scrum management

Back (Answer)

Uses prototypes with a few required features released at the start which build into the final program Sprint planning meeting held to allow scrum team to move work from product backlog into sprint backlog

#4
Front (Question)

Iterative Prototyping?

Back (Answer)

Large projects separate into smaller manageable parts These parts worked on independently Clients can give feedback and be shown improvements until they are happy

#5
Front (Question)

Intellectual Property Rights

Back (Answer)

Protect the visual layout of a website Copyright and Trademarks both come under this as they are Both are a breach of IPR if used without permission from the creator/developer

#6
Front (Question)

Usability Testing Criteria

Back (Answer)

Appropriate Customisable Accessible Consistent Controllable Helpful

#7
Front (Question)

Skeuomorphism

Back (Answer)

The way in which some interfaces mimic their physical counterparts eg a radio app with knobs and switches

#8
Front (Question)

Binary Search description

Back (Answer)

Binary search begins with the middle value and will split one of the two sides in half depending on whether the middle value is greater/less than the searched value